Powerline Trail 1

The first phase of the Powerline Trail shared-use path, opened in 2022, begins with a connection to the  Oak Leaf Trail at 105th and Cold Spring Rd, near Kulwicki Park. It extends east within the WE Energies power line corridor to 60th St. The corridor is located between Howard Ave and Cold Spring Rd in Greenfield. There is a rest stop at 68th St.

Powerline Trail 2

The second phase of the Powerline Trail shared-use path, opened in 2024, begins with a connection to the  Powerline Trail Phase 1 at 60th St. It extends east within the WE Energies power line corridor to 35th St, where it enters Pond View Park. There is a connection to Zablocki Park at 40th St.

Powerline Trail 3

The third phase of the Powerline Trail shared-use path is planned to be constructed in 2026. It begins with a connection to the  Oak Leaf Trail near Layton Ave and the Root River Parkway. It extends west within the WE Energies power line corridor to Edgerton Ave. There is a bridge over the Root River, as well as a connection to Rose Innovations Playground.

Powerline Trail 4

The fourth phase of the Powerline Trail shared-use path is planned to be constructed in 2024. It begins with a connection to the Powerline Trail Phase 1 at 99th and Cold Spring Rd. It extends southeast within the American Transmission Company power line corridor to 92nd St, where it connects to the 84 South development.

Falcon Ridge Trail

The Falcon Ridge Trail is an existing shared-use path. It begins at 116th/118th and Cold Spring Rd. It extends west to Beloit Rd, where it turns north. The trail connects to the Oak Leaf Trail at approximately 110th St. It then continues east to 108th St. The trail passes by the YMCA at 112th St.